EIA and permitting services for data centre in Finland

Planning a data centre project in Finland? Ecobio helps data centre developers manage environmental requirements, EIA and permitting procedures, and chemical safety obligations. We support developers from the early planning stages through to implementation and help integrate the required studies into the project schedule.

The permitting and environmental requirements for a data centre project depend particularly on its location, the ecological value of the site, the capacity of backup power systems, chemical storage and cooling solutions. Ecobio helps identify project requirements early, assess environmental impacts and prepare the necessary permit applications.

Our services for data centre projects

Environmental impact assessment (EIA)

Preliminary assessment of the need for an EIA, preparation of the EIA programme and EIA report. Assessment of the environmental impacts of data centre construction and operation, and engagement with authorities and stakeholders.

Environmental and water permits

Identification of data centre permitting requirements, preparation of permit applications and responses to comments. Assessment of requirements relating to backup power systems, emissions and water use.

Ecological surveys and studies to support permitting

Preliminary ecological assessments and field surveys at the data centre site and along associated infrastructure routes. Baseline reports, environmental risk assessments and best available techniques (BAT) assessments according to project needs.

Chemical safety and regulatory obligations

Identification of obligations relating to backup generator fuels, coolants and other chemicals. Chemical risk assessments, chemical inventories, KemiDigi documentation and safety data sheets.

Biodiversity

Calculation of the local biodiversity footprint of a data centre project and planning of measures to reduce impacts on biodiversity. Habitat restoration and management plans, biodiversity offset calculations and offsetting plans.

Climate and energy services

Assessment of data centre climate risks and carbon footprints, and expert services relating to energy efficiency. Support in assessing EU Taxonomy climate criteria and evaluating the project’s climate impacts.

Regulatory compliance – data centre projects in Finland

Environmental requirements for data centre projects in Finland vary according to the project’s size, location and characteristics. A data centre’s backup power systems may trigger the need for an environmental permit or an EIA procedure. Fuel storage and cooling solutions, for example, may also require chemical safety measures or a water permit.

Site conditions, such as nearby residential areas, ecologically valuable sites and groundwater areas, may impose requirements on building placement and the management of environmental impacts during construction and operation.

We help you identify the environmental obligations relevant to your data centre project and take them into account in project planning. We coordinate the studies and permit preparation with the project’s technical design.

How do we manage the environmental aspects and permitting of your data centre project?

Data centre projects are major investments that progress through several stages of planning and implementation. Permitting requirements become more specific as plans for backup power capacity, cooling solutions and building placement develop.

Ecobio oversees permit preparation and the collection of the necessary background information. When planning the project schedule, we account for the required studies, regulatory procedures and any phased implementation. If the technical plans change, we help identify the implications for environmental requirements and update the permit application materials accordingly.

When does a data centre need an environmental impact assessment in Finland (EIA)?

The need for an EIA in a data centre project in Finland depends on its scale, technical solutions and environmental impacts. For example, the combined rated thermal input of backup generators may trigger the need for an EIA procedure.

Under Finland’s Act on Environmental Impact Assessment Procedure, a boiler plant or power plant with a rated thermal input of at least 300 megawatts is subject to an EIA procedure. This may also apply to a data centre’s backup power system.

An EIA procedure may also be required on a case-by-case basis if a project is likely to have significant environmental impacts. The impacts of associated electricity transmission infrastructure are also included in the assessment where necessary.

Our EIA services

  • Assessment of the need for an EIA
  • Preparation of the EIA programme and EIA report
  • Assessment of all impacts identified as significant
  • Examination of alternatives and mitigation measures
  • Engagement with authorities and stakeholders

Permit application services for data centre projects

A data centre’s need for an environmental permit often relates to its backup power systems and fuel storage. Under Finland’s Environmental Protection Act, a fuel combustion plant with a rated thermal input of at least 50 megawatts requires an environmental permit.

An environmental permit may also be required because of other activities or environmental impacts, such as fuel storage volumes or noise.

A data centre’s cooling solutions affect water use and potential impacts on water bodies. A water permit may be needed, for example, for water abstraction from a water body or the construction of structures in water.

Environmental permitting services

  • Identification of environmental permitting requirements and the permitting process
  • Preparation of environmental, chemical safety or water permit applications
  • Assessment of the need for BAT assessments and baseline reports, and preparation of these studies
  • Environmental and chemical risk assessments
  • Preparation for discussions with authorities
  • Consideration of permit conditions and reporting obligations

Assessing biodiversity impacts in data centre projects

The construction of data centres and associated infrastructure may require extensive changes in land use. Construction can alter habitats, weaken ecological connectivity and harm biodiversity.

We help assess the local biodiversity footprint of your data centre project and identify opportunities to reduce its impacts on biodiversity.

Calculating the project’s biodiversity footprint provides an estimate of the harm it causes to biodiversity. The results can be used, for example, to inform the placement of buildings, service roads and electricity transmission connections and to reduce biodiversity impacts.

We help identify opportunities for measures that enhance local biodiversity and assess the feasibility of biodiversity offsetting.

Our biodiversity services

  • Calculation of local biodiversity footprints
  • Planning of measures to reduce biodiversity impacts
  • Habitat restoration and management plans
  • Biodiversity offset calculations and offsetting plans

Chemical safety in data centre projects

Chemical safety requirements for data centres mainly relate to backup generator fuels and chemicals used in cooling.

Data centres may store substantial quantities of fuel to prepare for power supply disruptions. Chemical safety requirements should be considered from the design stage. Ecobio helps identify chemical safety obligations and prepare the required documentation and studies.

Chemical management services

  • Chemical assessments
  • Chemical hazard classification
  • Identification of storage requirements
  • Chemical inventories and KemiDigi notifications
  • Preparation, review and management of safety data sheets
  • Chemical risk assessments and planning of risk management measures

What nature surveys may a data centre project need?

The need for nature surveys depends on the natural conditions at the data centre site and the impacts of the planned activities. Nature surveys may support an EIA procedure or form part of a biodiversity impact assessment. It is advisable to plan these surveys early in the project, as the timing of fieldwork depends on the habitats and species being studied. Bird surveys and certain species-specific surveys, for example, are seasonal.

We carry out preliminary ecological assessments, the necessary field surveys and biodiversity impact assessments. These studies may cover the planned data centre site or associated infrastructure, such as a power line.

Our nature survey services

  • Preliminary ecological assessments
  • Vegetation and habitat surveys
  • Bird surveys
  • Other species-specific surveys
  • Natura 2000 assessments

Climate and energy services for data centre projects

The high electricity consumption of data centres and the energy required for cooling make climate and energy key considerations in these projects. We help assess the project’s carbon footprint, identify climate change risks and determine the applicable energy efficiency requirements.

Our experts can also support climate risk assessments in accordance with the EU Taxonomy and help define climate and energy targets for data centre projects.

Our climate and energy services

  • Carbon footprint calculation
  • Climate risk assessment
  • EU Taxonomy assessment

Discuss your data centre project with an expert

Are you planning a new data centre or an expansion of an existing facility? Contact Ecobio’s experts to discuss your project’s needs!

Masi Mailammi

A partner for sustainability in the data centre industry

Ecobio supports Nordic data centre operator atNorth in its sustainability work and in meeting EU Taxonomy requirements.

The collaboration covers the development of management systems, climate risk assessments and climate transition planning.